The rehab is moving right along. I went by this morning, and there was something wrong w/ my camera flash so most of the pics didn’t come out. It doesn’t really matter that much, though, because pictures of plumbing & electrical aren’t really worth looking at.

Here’s a pic of the kitchen bar that’s been framed in. You can see to the back & right of it that a lot of other framing work was done. The framing behind the kitchen bar is the master bathroom – it turned out to be pretty huge, which was a very nice surprise. Oh, one other surprise we had was when we demo’ed the half wall on the loft – you can see here that the original builder/architect used a steel I-beam to support the loft. He was pretty serious about this home when he designed it.
Here’s a photo of the front closet. Nothing really much to see here, but the plumbing has been run to convert this to the half bath. Again, plumbing rough isn’t a lot of fun to take pictures of.

So…that’s where we are right now. We’re about 2 days ahead of schedule & slightly under budget. I’m meeting with Lane, the welder, this evening to talk about the loft rail design. He’s going to start fabricating it this week to install next week.

user